The Complete Guide to Basement Renovations in London, Ontario
Finishing a basement is the single best way to add livable square footage to a London, Ontario home without building an addition. You're working with space that already has four walls, a floor, and a ceiling. The structure is there — it just needs to be made livable.
But basements come with their own set of challenges, especially in Southwestern Ontario where moisture is a real factor. Here's what to know before you start.
Why Finish Your Basement
A finished basement adds 25 to 35 percent more living space to most London homes. In a housing market where moving up means spending hundreds of thousands more, finishing the basement you already have makes a lot of financial sense.
Common basement uses we see:
- Family room or rec room
- Home office or remote work space
- Extra bedroom (requires egress window for code compliance)
- Home gym
- Rental suite (secondary suite regulations apply in London)
- Laundry and storage upgrade
A well-finished basement also increases resale value. In London's market, a finished basement with a bathroom can add $30,000 to $60,000 to your home's value — often more than the cost of the renovation itself.
Step-by-Step Process
A full basement finish involves multiple trades and stages. Here's the typical order of operations:
1. Inspection and planning
Before any work starts, the space needs to be assessed. We look at moisture levels, ceiling height (minimum 6 feet 5 inches for Ontario Building Code), existing plumbing and electrical, and structural elements like beams and columns. This determines what's possible and what the layout should be.
2. Demolition
If the basement has old finishes, panelling, or damaged materials, they come out first. Interior demolition clears the space back to bare walls and concrete so we can start fresh. This also reveals any hidden issues — water staining, mould, cracks — that need to be addressed before we build.
3. Moisture remediation
Any moisture issues get solved at this stage. This might mean crack injection, interior drainage tile, sump pump installation, or exterior waterproofing. Skipping this step is the most common and most expensive mistake in basement renovations. More on this below.
4. Framing
Walls get framed with 2x4 lumber, usually set 1 inch off the concrete foundation wall to allow for insulation and to prevent moisture wicking. We frame around columns, ductwork, and mechanical areas, and build in any closets, bulkheads, or room dividers.
5. Electrical and plumbing rough-in
Wiring for outlets, lighting, and any dedicated circuits (home theatre, workshop) goes in before the walls are closed up. If you're adding a bathroom, the plumbing rough-in — drain lines, water supply — happens now. This is the stage that requires licensed sub-trades and an ESA inspection in Ontario.
6. Insulation
For Ontario basements, we typically use rigid foam board (minimum R-20) directly against the foundation wall, followed by batt insulation in the framed cavities. This combination meets Ontario Building Code requirements and provides good thermal and moisture performance.
7. Drywall
Drywall installation closes up the walls and ceiling. Sheets are hung, taped, mudded, and sanded smooth. Ceiling drywall around ductwork and beams creates clean bulkheads. If you want access to plumbing or electrical later, we can frame in access panels.
8. Flooring
Flooring goes in after the walls are finished. For basements, we recommend luxury vinyl plank (LVP) or engineered hardwood — both handle the moisture and temperature swings that are normal in below-grade spaces. Carpet is an option for bedrooms but is less forgiving if you ever get water.
9. Trim and finishing
Trim carpentry — baseboards, door casings, window trim — goes in last. Then paint, lighting fixtures, and any built-ins. This is the stage where the space starts to look like an actual room.
Moisture and Waterproofing
This is the section that matters most for London homeowners. Our clay-heavy soil and water table make basement moisture a reality that has to be dealt with — not ignored.
Before you finish a single wall, you need to know your basement is dry.
Signs of moisture problems:
- White powdery residue on concrete walls (efflorescence)
- Musty smell, especially in spring and summer
- Visible water staining or tide marks on the walls
- Damp or cool feeling on the concrete floor
- Cracks in the foundation wall, even hairline cracks
If you see any of these, address them before starting the renovation. Finishing over a moisture problem doesn't make it go away — it hides it until the drywall starts growing mould behind the insulation, and then you're tearing everything out and starting over.
Common solutions include foundation crack injection, interior weeping tile with a sump pump, exterior waterproofing membrane, and improved grading and downspout extensions outside.
Permits in London, Ontario
In the City of London, you need a building permit for any basement finish that involves framing, electrical, plumbing, or changes to the structure. The permit ensures the work is inspected and meets the Ontario Building Code.
Key code requirements for London basements:
- Ceiling height: Minimum 6 feet 5 inches clear (6'5") under beams and ductwork
- Egress: Any bedroom needs an emergency escape window (minimum 3.8 sq ft opening)
- Smoke and CO detectors: Required on every level of the home
- Insulation: Minimum R-20 on foundation walls
- Electrical: ESA inspection required for all new wiring
We handle the permit application and schedule all required inspections. The permit process in London typically takes 2 to 4 weeks for approval.
What It Costs
Basement finishing costs in London, Ontario depend heavily on the scope. Here's what to expect:
| Scope | Cost Range | What's Included |
|---|---|---|
| Basic finish (open concept) | $25,000 – $40,000 | Framing, insulation, drywall, flooring, paint, basic lighting |
| Standard finish with bathroom | $40,000 – $65,000 | Above + 3-piece bathroom, trim, better flooring |
| Full custom finish | $60,000 – $90,000+ | Multiple rooms, full bathroom, wet bar, custom built-ins |
| Rental suite / secondary suite | $70,000 – $120,000+ | Full kitchen, bathroom, separate entrance, fire separation |
These ranges are for a typical London home with a 800 to 1,200 square foot basement. Costs go up with ceiling height challenges, extensive plumbing, and high-end finishes.
Timeline
A straightforward basement finish — framing through to trim — takes 4 to 8 weeks once the permit is in hand. Adding a bathroom extends the timeline by 1 to 2 weeks. A full secondary suite can take 10 to 14 weeks.
The permit process adds 2 to 4 weeks upfront. Plan for a total of 6 to 12 weeks from signing to move-in, depending on scope.
Inspections happen at specific stages (framing, insulation, rough-in, final) and can add a day or two of waiting between stages. We schedule these proactively so they don't stall the project.
Planning a Basement Renovation?
We handle everything — demolition, framing, drywall, flooring, and trim — all in-house. Free estimates across London and Southwestern Ontario.
Get a Free EstimateOr call (519) 619-3040
For more on our full-service approach, visit our home renovations page or get in touch for a free estimate.